Çocuklara dayanıklı ambalaj kutularının tek elden çözüm üreticisine 15 yıllık odaklanma
After the final written confirmation of the sample, the typical production lead time is approximately 8 to 12 working days. This timeline covers the entire process from production preparation to finished product packaging and shipment. The specific duration may vary depending on the complexity and quantity of the order.
A standard order typically includes the following key stages: 1. Production file confirmation and material preparation ; 2. Printing and surface finishing (e.g., color printing, lamination, hot stamping, etc.); 3. Die-cutting and forming processes (for different structures such as Lid and Base Boxes, Tuck End Boxes, Child-Resistant (CR) Packaging, etc.); 4. Assembly and quality inspection (including testing of functional points like child-resistant locking mechanisms); 5. Packaging and shipping preparation .
It is important to note that the following situations may lead to an extended lead time: first-time production of a completely new custom design (involving mold development and testing), orders requiring specific third-party certifications (such as child-resistant test reports), or instances involving public holidays or peak production periods at the factory. We recommend discussing your timeline requirements with us early in the project, and we will strive to create an optimal production schedule to meet your needs.
Conus bizimle
İletişim: Lincoln Zhang Bai Ling
Phone:86 13927437624
E-posta: Lincoln@eccody.com
Naber: 86 13927437624
Şirket Adresi: Bina 4, Zhongsheng Teknoloji Parkı, He'erer Road, Dawangshan Topluluğu, Shajing Street, Bao'an Bölgesi, Shenzhen, Çin